Asian Fab Kengeri master plan: what can and cannot be verified
The Asian Fab Kengeri master plan cannot yet be published as verified current-project geometry. The supplied drawing visibly labels T01 to T04, uses T05 for amenities and appears to repeat or mislabel T03, while the current working brief states eight towers. That identity and revision conflict makes the drawing unsuitable as the current Asian Fab Kengeri site plan. The public image is instead an original generic planning concept: it is not to scale and does not state actual access, orientation, phasing, setbacks or Asian Fab Kengeri open space. The eight-tower figure remains a working-brief fact, not a visual claim about where Asian Fab Kengeri towers sit. Before comparing a unit by view or phase, obtain a dated sanctioned drawing that matches the legal project name, tower schedule and registration record. Then check the proposed unit against access roads, service areas, amenity edges, construction phases and neighbouring towers on that same revision.
What the current master-plan sheet must reconcile
Do not compare tower positions until one current drawing closes each of these checks.
- Project identity and drawing revisionThe drawing must match the current legal project name and carry a usable revision date.
- Eight-tower building scheduleEvery tower label should reconcile with the current working tower count.
- Access, service areas and open-space labelsThese decide movement and outlook but are not verified by the generic concept.
- Selected unit, tower and phaseA unit comparison needs all three on the same approved revision.
The site plan, phase by phase
Conceptual residential planning study

Brochure and plan pack: How is the land used, and what will I look at?
Request the current approved master plan before comparing tower position, access or orientation.
The master-plan sheet and brochure pack with phasing marked